Residential Construction Agreement (sample)

House Construction Contract PDF Download
Date: [Insert your date, e.g., April 11, 2025]
Prepared by: [Your name or company name, if applicable]
1. Parties Involved
Party | Details |
---|---|
First Party (Owner) | Name: [Owner’s Name] Address: [Address] Aadhaar Number: [Number] Phone Number: [Number] Email: [Email] |
Second Party (Contractor) | Name: [Contractor’s Name] Address: [Address] Aadhaar Number: [Number] Phone Number: [Number] Email: [Email] GST Number: [If applicable] |
2. Construction Details
By mutual consent, the Second Party agrees to construct a [House Size] sqft house for the First Party on a [Plot Size] cent plot located in [Location Details: District, Taluk, Village, Panchayat, Ward], as per the provided plan and elevation, for a total cost of ₹[Amount]. The Second Party is obligated to execute the construction and complete the work within the stipulated timeline.
3. Payment Schedule
Construction Phase | Percentage | Amount (₹) |
---|---|---|
Upon Signing the Contract | 10% | [Amount] |
Upon Foundation Completion | 10% | [Amount] |
Upon Lintel Completion | 10% | [Amount] |
Upon Main Slab Completion | 20% | [Amount] |
Upon Completion of Plumbing/Electrical Work and Start of Plastering | 5% | [Amount] |
Upon Start of Tile Work | 15% | [Amount] |
Upon Completion of Plumbing/Electrical Work | 10% | [Amount] |
Upon Completion of Painting | 10% | [Amount] |
On Final Handover Day | 10% | [Amount] |
4. Construction Components
4.1. Substructure
- Clear and level the land by removing unnecessary elements.
- Prepare the foundation as required.
- DR masonry: Using 60x60 cm stones.
- RR masonry: Using 45x45 cm stones with 1:6 cement mortar.
- RCC plinth beam: 15 cm thick, 30 cm wide, M20 mix, using 8 mm rods.
- Cement, reinforcement, and metal brands: UltraTech, ACC, Tata, JSW, or other ISI-approved brands.
4.2. Superstructure
- Solid block work in 1:5 cement mortar up to 3 meters height.
- Door and window frames as per the plan.
- Lintel and slabs: M20 mix, using 8 mm rods.
- Complete plastering (walls, ceilings, beams).
- Use ISI-grade PPC cement.
4.3. Sanitary Works
- Sanitary fittings and tanks will be ISI-approved brands.
- Includes septic tank, 1000-liter PVC water tank, closet, kitchen sink, and health faucet.
- Bathroom accessories: Soap holder, towel rod, brush holder.
4.4. Electrical Works
- Wiring and fittings as per the electrical drawing.
- Wire brands: [Your choice].
- Switches: [Your choice].
- Circuit breakers: [Your choice].
- Includes inverter wiring and AC wiring.
4.5. Flooring
- Granite, vitrified tiles, and anti-skid tiles used as per area requirements.
- Price range: ₹45/sqft to ₹150/sqft.
4.6. Painting
- Interior: 2 coats of wall putty, primer, and emulsion.
- Exterior: 1 coat of primer, 2 coats of emulsion.
- Doors/windows/grills: Epoxy and MRF clear coat.
4.7. Miscellaneous Works
- Includes front door, room doors, and bathroom doors.
- Includes locks, hinges, and handrails.
5. Important Notes
- This is a reference agreement only. It can be modified based on individual requirements.
- All components must be verified, and both parties should sign each page.
- Specify the brands of all construction materials in the contract.
- Include provisions for potential additional costs or delays during construction.
- Have the contract reviewed by a legal expert before signing.
6. Signatures & Confirmation
First Party (Owner)
Name: [Name]
Signature: ____________________
Date: [Date]
Second Party (Contractor)
Name: [Name]
Signature: ____________________
Date: [Date]
Witnesses (if applicable)
Name: [Name], Signature: ____________________
Name: [Name], Signature: ____________________
Stages of Construction
- Plan & Approval
- 3D Design
- Plot Clearing & Pegging
- Foundation Excavation
- Foundation
- Basement
- Belt
- Soil Filling & Floor Preparation
- Wall Construction
- Sill Level Concrete
- Door/Window Frame Fixing
- Lintel Concrete
- Upper Wall Construction
- Main Slab Concrete & Floor Concrete
- Electrical Piping
- Plastering
- Plumbing
- White Cement & Putty Work
- Waterproofing
- Flooring
- Electrical Cable Fixing
- Woodwork
- Painting
- Interior Work